We’re 100% Green

The stats are in! At DRASS Romania, the solar panels installed in 2024 are already delivering phenomenal results across our offices and vast production facilities. In fact, over the last 12 months, our energy consumption was fully covered by renewable energy produced on-site:

  • 241.49 MWh solar energy generated
  • 232.30 MWh total energy consumed

Aside from minimal grid use at night and during cloudy weather, our solar production is more than offsetting our consumption.

A measurable step toward cleaner operations and a more sustainable future for DRASS Group.

Related Blogs